The Water Gates

 

The Water Gates

My Blogs are like buses, you wait ages for one and then two turn up together. As promised in my last blog here is more detail of the installation of the lock gates at Bacton Wood.
On a cold sunny day in February 2017 the lower gates for the lock at Bacton Wood were lifted into place.
Dog walkers and ramblers watched as the enormous structures were lifted into position in the entrance to the lock. But none of the spectators were aware of the effort it had taken to arrive at this final part of the project.

2nd gate being lifted into position
Work had started on the gates in August 2016. The material of choice was
 Greenheart  timber.   A close grained timber from South America weighing in at around seventy pounds per cubic foot.  
Greenheart is so dense it will not float. The major advantage of Greenheart is it’s resistance to most water-bourne parasites that attack and destroy softer timbers.
Contructing the two gates would require a total of twenty Mortise and Tennon joints cut into the timber frames. Because of the density of the timber, completing three or four  Mortise joints in a day was considered good going. Splinters from Greenheart timber, commonly turn septic due to toxins contained in this most durable of hard woods. 
Greenheart splinters commonly turn septic.
Because each upright weighs over half a ton, a hydraulic lift was essential to manoeuvre them into position. The next task was to cut twenty tennons into the lighter cross members.
These weighed a mere quarter of a ton each.

Completed tennons
 When all the joints had been completed the gates were laid out on the workshop floor. 
Then each one in turn was checked by dry fitting them.  Some were a perfect fit – while others needed some fine adjustment. 
Cargo straps were used to draw the components together and a pinch bar used to part them.
Dry fitting the joints.
Cargo straps used to close the components.
A pinch bar parting the joints.
As well as aligning all the timber components, tie irons also had to be fitted before the gate could be assembled. Each joint was cleaned out with an airline. Then all the cross members and tie irons were aligned ready for the final assembly.

A waterproof, polyurethane adhesive was applied to each joint. 

Applying the adhesive.

Once applied the glue would set within thirty minutes.  Just thirty minutes to align and close all the joints with no second chance.  Any mistakes or delays at this stage would have been disastrous. The physical effort needed to hastily draw all the joints together before the adhesive began to set was  a really tough session.
Drawing all the joints together-a tough session.
January 22nd 2017 dawned cold and frosty. 
A group of Trust volunteers had assembled to plank the gates.  Tannalised Pine was cut to length and laid into position on the gates.
When the planks were in place one hundred pilot holes were drilled through the pine into the frame below.
Drilling pilot holes into the frames.
 The planks were then removed and stacked in order,while the pilot holes were drilled out to a suitable depth in the frame.  
Replacing the planks.

This done, the planks were carefully replaced in the exact position from where they had been removed.  When all the drilled holes were perfectly aligned, the planks were glued into position and screwed down. 

Screwing down the planks.
Constructing the gates was only part of the project.  A means to transport them had to be found.  This was achieved by modifying the brute of an old farm trailer.
 
On the coldest winter’s day of 2017, the volunteers set about converting the trailer.
The conversion was a fairly low tech affair.  In spite of  the trailer’s short comings  it was perfect for the job.  What it lacked in style and elegance was more than compensated for in strength.
Converting the trailer.
The gates weighing almost four tons each were lifted onto the trailer and transported from the yard to the canal. 

Transporting the gates to the lock.
Saturday February 18th.
To lower the water level in the lock chamber a battery of pumps had been running every day for almost a week.

Pumping out the lock chamber.
Intrepid volunteers donned their wellington boots, armed themselves with shovels and ventured into the lock chamber to remove the mud and silt that the pumps couldn’t clear. 
The sludge was loaded into the JCB bucket and lifted out of the chamber.

Volunteers removing the silt from the lock chamber.
When operational, the bottom edge of the gates would traverse over a recess in the floor  of the lock. But the gates could not be lifted into place until the recess had been cleared of water and silt. 
 
The project was falling behind schedule.

Clearing the recess was taking longer than planned and the project was falling well behind schedule.
Eventually by late afternoon the first gate was lifted into position and secured against the lock. 

Sunday February 19th. 
The pumps had been shut down overnight resulting in the water level rising by about two feet in the lock chamber.  Before the second lift could go ahead the water would have to be pumped out.

The recess in the floor of the lock had become submerged again.  So the “bucket and chuck it” brigade was called into action yet again.

By midday the second lift was ready.  
Like clockwork the massive gate was lifted, turned, and lowered into the lock.

Second gate lifted into position.
Good for the next hundred years, the gates will stand as a monument to the folks who built and erected them. 

New gates installed.

A Film of the project can be seen at the Atrium Theatre, Spenser Avenue, North Walsham.
April 24th 2018 as part of the "Canal Film Night".

Wednesday, 11 November 2015

No Time To Blog.

What happened to summer?
I can remember the Easter holiday quite clearly that is when I planted my potatoes. Elated by the thought that spring had arrived and the whole English summer stretched out before me.
 Next thing I know it is October and our British winter is beckoning.
There is nothing wrong with winter for it brings - fantastic brittle light -   sunlight on frost covered trees and winter visitors on the wing.   This is all very well but what of my missing summer.  For the most part my time was devoted to the North Walsham and Dilham canal and "Hathor's" restoration programme.  Both these major projects kept me occupied for three or four days most weeks.

Springtime on the canal - Brrrr.


Hathor's restoration took precedence over all the other current film projects as the June deadline loomed.  The closing stages, the work became so intense there were occasions when I put the camera down and helped out with some of the more unskilled tasks.  There are small parts of  "Hathor's" varnished interior that allows me to puff out my little chest and proudly say "I did that bit."

Hathor was on the slipway for eight months while her hull was restored then a further ten months in the wet shed for interior renovation.
All things considered the double DVD set  covers the wherry's restoration fairly comprehensively.
From "Hauling out", steaming planks, constructing the new rudder and restoring her interior cabins.
The production opens with a brief history of the vessel's design and ends with the re-launch and blessing at How Hill, "Hathor's" spiritual home. 

Although I am reasonably satisfied with the final result I was quite relieved when the project was completed.  Although probably not as relieved as the staff at Wherry Yacht Charter who had spent two years with my camera in their faces.


Repairing "Hathor's" Hull
The DVDs are now on sale, they can be purchased in Norwich from the City Bookshop, in Davey Place.   Or via http://bigskyuk.weebly.com/dvds-for-sale.html       All profits will go toward maintaining "Hathor."


Sunday, 17 March 2013

Wherries and Waterways in Winter.

Winter arrived quite late in East Anglia this year and once established it has seemed very reluctant to leave.  The winter sun which can add a real sparkle to film at this time of year has remained hidden behind layers of oppressive grey cloud.   In spite of the poor conditions it has been possible to shoot some film on the better days.

Some of the most interesting footage this winter has been the progress the of the wherry yacht "Olive" being overhauled at Wroxham.   "Olive" was built by Earnest Collins in 1909 and named after his youngest daughter.  She began working as a holiday cruiser for Blakes the same year and continued working until 1958 when she was sold into private ownership.   Now in the care of of the Wherry Yacht Charter Trust  "Olive" was re-floated in February this year looking very spruce as her freshly painted hull slipped into the water.  Such a dramatic change compared to the tired looking craft that had been winched onto the slipway in July last year.  

Re-floating "Olive"

A few days later it was the turn of "Olive's" sister ship, "White Moth", to be winched onto the vacant slipway.  With the exception of the giant airbags I imagine the operation was not so very different from the traditional methods used long ago in the boatyards.  Watching this grand old vessel inching her way up the track  was a fascinating sight.   

Coltishall Boatyard c1900

Hundreds of man-hours are worked on these essentially Norfolk craft through the winter months.
Fingers numbed with cold and breath vapourising in the frosty morning air are just part of the job.



Another of my regular haunts is the North Walsham and Dilham canal. Spectacular progress on the canal has been maintained over the last twelve months.   Work has been concentrated on the dried out section around Bacton Wood and Royston bridge when the weather has permitted.   The very wet December and the January snow has slowed down the determined work parties but not stopped them altogether.

Winter on The North Walsham and Dilham
We have recorded several hours of video on the canal this winter.  The latest footage will soon be added to the series of DVD's which are now available from the NW&D Canal Trust. http://eawa.co.uk/work.html
Details also available from http://bigskyuk.weebly.com/coming-soon.html 


Winter on the canal can be an in-hospitable place when a stiff  North Easterly is blowing across the open Norfolk landscape.  My fingers have turned blue many times this winter operating the camera and my thoughts have often turned to the wherrymen who sailed these waterways in winter.  Imagine slipping the keel in mid January - Hands in ice-cold water removing stubborn bolts. 
Hard as nails!